⚡ 2D PDF Conflict Detection — No BIM Required

Human Error Ends Here.

Upload your construction PDFs. Our AI cross-references every sheet across A, S, M, E, P, F, C, L, and ID disciplines to flag the coordination conflicts that generate change orders—before you break ground.

Same day results
Shareable reports
9 disciplines analyzed
RFI-ready language
9
disciplines reviewed in a single pass
A · S · M · E · P · F · C · L · ID
1
unified conflict report
every discipline, in one place
0
BIM or setup required
upload PDFs as-is

A $65 Billion Problem Hiding in Your Plans

Every year, the U.S. construction industry loses $65 billion to rework caused by design errors, coordination gaps, and miscommunication between trades.

Missed Clashes
Plumbing through beams. Ducts hitting ceilings. Conflicts buried across hundreds of sheets that nobody catches until steel is in the air.
Costly Change Orders
Every coordination miss becomes an RFI, then a change order, then a schedule hit. The average rework event costs $50K–$500K per project.
Wasted Time
Your team spends weeks cross-checking plans by hand. Flikt.AI does it in hours—across all 9 disciplines, every sheet, every detail.

Source: Autodesk/FMI 2022 Rework Study; CII RT-153 (359 projects)

Three Categories of Conflict Detection

Our AI analyzes your complete plan set to find the issues that generate RFIs and change orders.

Cross-Discipline

  • Elevation vs floor plan conflicts
  • Grading mismatches
  • Deferred engineering scope gaps
  • MEP routing conflicts
📏

Dimensional

  • ADA slope compliance
  • Drainage capacity validation
  • Clearance requirements
  • Wind pressure calculations
📄

Document QA

  • Revision mismatches
  • Open RFI tracking
  • Placeholder fields
  • Naming inconsistencies

How It Works

Four steps from upload to a certified, shareable report

📤
1

Submit

Drop your PDF plan set — no BIM model required.

🔍
2

Scan

AI tags all 9 disciplines and cross-checks every sheet for conflicts.

💾
3

Save

Fix conflicts on the plans, not in the field — saving time, money, headaches, and liability.

🔗
4

Share

Share a clean, certified report with your team. No login required to view.

CALCULATE YOUR SAVINGS

How much could you save?

Use our ROI calculator to estimate your potential savings. At $1,500 average cost per field-discovered clash, even one caught conflict can pay for the entire analysis.

Clash cost estimate: Catenda/United-BIM industry benchmarks

$1,500 per clash

Average cost of a coordination conflict discovered in the field

🕐

0.5 weeks per clash

Average schedule delay from each major coordination issue

9 Disciplines Analyzed

Cross-references Architectural, Structural, Mechanical, Electrical, Plumbing, Fire Protection, Civil, Landscape, and Interior Design plans in a single pass

🧮

ROI Calculator

See your potential savings

Projects per year 10
1 50
Avg. project value $5M
$1M $50M
Sheets per project 100
20 500
Your Estimated Annual Savings
💵 Cost Savings
$540,000
🕐 Time Saved
120 weeks
See These Savings on Your Projects

Simple, Transparent Pricing

Monthly subscriptions or per-project pricing. Find the plan that fits your workflow.

View Pricing Plans →
SCHEDULE A DEMO

See Flikt.AI in action on your plans

Book a 30-minute call to see how Flikt.AI can reduce your rework costs and protect your schedule.

📄

Live Plan Analysis

See the AI analyze a real plan set in real-time

💵

ROI Discussion

Calculate potential savings for your portfolio

💬

Q&A Session

Get answers to your specific questions

📅

Book Your Demo

30 minutes · Free · No obligation

or connect on
Connect on LinkedIn

Ready to catch conflicts early?

Upload your plan set and get AI-powered conflict detection.