What do drawing & spec errors really cost your project?
A 60-second forecast of RFI volume, change-order dollars, and schedule slip on your next job — benchmarked against published industry data. No login. No email required.
Your project
Forecast
Expected RFIs
—
RFI processing cost
—
Change-order dollars
—
Schedule impact
—
Documentation-error total
—
What to do about it
An estimated 60–80% of these costs trace to drawing-spec conflicts. FLIKT catches them before construction starts.
Try the Demo →
View Pricing
How is this calculated?
Estimates only, not suitable for litigation, damages, or contract negotiation. Benchmarks: Navigant Construction Forum (2013), FMI/Autodesk (2020), Dodge SmartMarket (2018), CII RT-265 (2011), NIST GCR 04-867 (2004). All outputs presented as ±25% ranges around the central forecast.
Averages are a starting point, not your number. Run a finished project against its own RFI log and see how many of those RFIs were answerable from the drawings before anyone broke ground.
Free field guide
The pre-IFC coordination checklist
50 checks before you issue for construction, ordered by what actually goes wrong — built from 1,516 findings across 34 real plan sets. Comes as an assignable tracker (Excel) with status, owner and due date, plus a printable PDF. No call, no card.