Catch conflicts before they become change orders.
Upload your construction plan set. Our AI cross-references every sheet across all 16 disciplines and flags the coordination conflicts that turn into RFIs and change orders — delivered same day.
From PDF to report in one pass — no model, no meeting.
Upload
Drop your PDF plan set. No BIM, no account hoops.
Scan
AI tags all 16 disciplines and cross-checks every sheet for conflicts, missing dimensions, and spec-to-plan contradictions.
Share
Get a clean, certified report with sheet references and severity on every finding. Send it to your team — no login required to view.
This is what you get back.
A 24″×12″ supply duct is routed through the depth of beam B-14 (W18). The duct centerline sits 9″ below bottom of steel — no coordinated soffit or transfer shown on either sheet.
Why it matters: discovered in the field, this is a stop-work, an RFI, and a soffit redesign — typically $10K+ and 1–2 weeks once trailing trades stack up.
Suggested action: confirm plenum depth vs. beam schedule before MEP rough-in; RFI to EOR/ME.
Every finding comes with the sheets, the severity, and plain-language reasoning you can drop straight into an RFI.
One set. One price. No subscription required.
| Pages | Report (PDF + Excel) | Full Portal |
|---|---|---|
| Up to 30 | $129 | $169 |
| Up to 60 | $149 | $229 |
| Up to 80 | $199 | $279 |
| Up to 120 | $299 | $399 |
Same-day delivery. Sets over 120 pages route through Enterprise. Reports supplement, not replace, professional review.
Before you upload, it is worth knowing whether this suits your project at all — the fit criteria are published, including the cases where the answer is no. For what comes back, see what we check.
Quick answers
No. Flikt reads your 2D PDFs directly. Most light-commercial and residential jobs have no model — that’s exactly the gap we fill.
Same day. Upload your set, get the report back the same day — no scheduling, no call.
Every finding is sheet-referenced and severity-rated so you can verify it against the drawings in seconds. Flikt is built to supplement your review — a tireless second set of eyes that never skips a sheet.
Find the conflicts while they’re still cheap to fix.
A field-discovered clash averages ~$1,500 and half a week. One catch pays for the whole report.