Case Studies

Real Issues Caught. Real Money Saved.

General Contractors use Flikt.AI to catch coordination conflicts before they hit the field. Here’s what we’ve caught for them — with full GC validation, anonymized for client confidentiality.

A-Z Builds South Florida · Commercial Retail 5 disciplines · 8 sheets

5 cross-discipline coordination conflicts flagged pre-construction on a commercial retail project — all confirmed accurate by the General Contractor.

  • 5 conflicts detected, all GC-confirmed
  • $55K–$120K rework caught in flagged conflicts
  • $233K–$583K total project exposure identified
Read case study
Rose Remodeling & Construction, LLC South Florida · Single-Family Residence 4 disciplines · 63 sheets

A Mechanical / Structural plenum clash flagged pre-construction. The field team missed it — the duct hit the beam, an interior soffit was field-built, and the schedule slipped. Confirmed by the GC.

  • $10,000+ field cost overrun (inside pre-con estimate)
  • 2+ weeks schedule delay
  • $64,552–$147,517 exposure across 11 findings
Read case study

Want to see what Flikt.AI can find in your plans?

Upload your drawing set. Get a coordination report with sheet-level findings, severity ratings, and cost exposure in hours — not weeks.

All case studies are published with the General Contractor’s permission. Project addresses and identifying details are anonymized where appropriate.